( hospitality )

( )your hotel

We are the technical partner of hotel groups, owners and design studios. We get every hotel to opening day true to the brand, on time and without surprises.

Hospitality

A hotel is a brand you can touch

Every room, lobby and restaurant has to tell the same story as the brand, meet its standards and work from the very first guest. That is where we come in: we turn the vision of the group and the designer into a buildable, coordinated and measurable project.

Our role

What we bring to every hotel project

We join the project team, whether on the brand's, the owner's or the design studio's side, and take on the technical work that gets the design to site intact.

01

Brand standards

We know the brand standards of the major groups and apply them from the first drawing: dimensions, finishes, accessibility and operational requirements.

02

Technical design

We take the concept through to construction documents: drawings, details and a package ready to tender and build.

03

BIM coordination

One model coordinated across architecture, interiors and MEP. Fewer clashes on site and decisions made with data.

04

FF&E and specification

We specify furniture, finishes and equipment room by room, with our own tools so nothing gets lost between revisions.

Who we work with

We sit on any side of the table:

Whoever calls us, the goal is the same: a hotel that opens as it was designed, true to the brand and within budget.

01 / 03

Hotel groups and operators

(the brand)

We make sure every opening and every renovation meets the brand standards, hotel after hotel.

We are a technical counterpart who speaks your language and knows your design reviews.

02 / 03

Owners and developers

(the investment)

We protect the investment: a well documented project means fewer changes on site, tighter programmes and costs.

And an easier brand approval, so every key starts earning as soon as possible.

03 / 03

Design studios

(the design)

We expand your studio's capacity on hotel projects.

You set the design; we detail it, coordinate it and take it to site without losing its intent.

When we come in

At any point in the life of a hotel

We can stay with the project from start to finish, or strengthen just the stage that needs it.

  1. 01
    Concept

    Feasibility, brief and fitting the brand into the building.

  2. 02
    Brand approval

    Packages for the group's design reviews.

  3. 03
    Technical design

    Construction documents, details and BIM coordination.

  4. 04
    FF&E and procurement

    Specification, schedules and tender support.

  5. 05
    Construction

    Technical follow-up and answers to site queries.

  6. 06
    Opening and renovation

    Mock-up rooms, PIPs and repositioning of existing hotels.

01Concept

Feasibility, brief and fitting the brand into the building.

Technology

In a hotel, the margin is won before opening day

Hotel investment is measured per key, and every week of delay is a week without revenue. So drawing well is not enough: we use our own technology to keep specification, budget and purchasing in one place, with the cost of every decision in plain sight.

01

One source of truth

FF&E, materials and OS&E by area and by room, connected to the Revit model. What gets specified is what gets budgeted and what gets bought.

02

Cost, always in sight

The budget adds itself up from the specs. A change of finish or supplier shows its impact before it is approved, not on the invoice.

03

Fewer hours without value

AI fills in the specs from the maker's website and the model updates with no scripts. The team spends its time deciding, not copying data.

Our tools

Tools born from what our clients need

We didn't start from off-the-shelf software. We built each tool ourselves to solve a real problem we kept running into on our clients' hotels, and we keep refining it with them.

[specbook]

The hotel's specification, live in the model

All the project's FF&E and OS&E, room by room, with image, code, status and price.

  • Complete specs in under a minute: AI reads the maker's website and data sheet.
  • Changes are written to Revit after your review, with no scripts.
  • The budget is calculated from the specs and is always up to date.
See [specbook] in detail
latroupeapps.com / specbook / budget
[specbook] · The hotel's specification, live in the model

[specbook] procurementin development

Purchasing, from the same specs

A hotel is furnished with hundreds of pieces from many different suppliers. Procurement keeps them in order without leaving specbook, so nothing arrives late for opening.

  • Orders to each supplier with their order sheet and delivery address.
  • Partial deliveries and issues, tracked piece by piece.
  • The whole supplier conversation next to the order.
See procurement in detail
latroupeapps.com / specbook / procurement
[specbook] procurement · Purchasing, from the same specs

Projects

Some of the hotels we have worked on

ORO Hato Rey · Marriott Autograph Collection · San Juan, Puerto Rico · latroupe()
ORO Hato ReyMarriott Autograph Collection · San Juan, Puerto Rico
Axonometric of a hotel bar lounge · latroupe()
Andaz Turks & Caicos at Grace Bay · Hyatt · Grace Bay, Turks and Caicos · latroupe()
Andaz Turks & Caicos at Grace BayHyatt · Grace Bay, Turks and Caicos
Axonometric of a guest room wardrobe · latroupe()
Radisson Blu Hamburg · Radisson Blu · Hamburg, Germany · latroupe()
Radisson Blu HamburgRadisson Blu · Hamburg, Germany

Hotel brands we have worked with

Let's talk.

Tell us where your project is, whether you're just starting out or already on site. It all begins with a video call to get to know each other, no strings attached. We reply within one working day.